Cross Plant Actual Costing (CKMLCP) run

69 Views

Hi,

In a case where production goes across plants (i.e. an assembly (built in Plant1) is used as a component in another assembly in another plant (Plant2)), should we expect variances created on the assembly in Plant1 to flow to the final assembly in Plant2?

For this to happen, should CKMLCP be run for both plants at the same time (i.e. in the same run)?

In my scenario, a material master record is created in plant2 for the assembly manufactured in Plant1 with a procurement key pointing to Plant1.

Thanks.