on 08-23-2011 7:14 AM
Hello Experts
My client did the mass change of cost center master data through T.Code KS12. Here, few of the cost centers analysis (validity period is different) like cost center X - analysis period was 01.01.2008 to 31.12.9999, & Cost center Y - analysis period was 01.01.2011 to 31.12.9999.
Since he did the change (through T.Code KS12) w.e.f 01.01.2011 to 31.12.9999, few of the cost centers created the mutliple analysis periods at cost center level ( i understand this is SAP standard behaviour)
Now, if he choose the display of cost center - X through KS03, he is getting two analysis periods
(a) 01.01.2008 to 31.12.2010
(b) 01.01.2011 to 31.12.9999
However my client does not want to see two analysis periods in cost center master data.
Kindly advise is there any SAP standard procedure to revert back / SAP note which can coorect the same
Regards
Anil Kumar
If there are no postings during that analysis period you can delete the same if not required to avoid the message.
I will test the same if any other solution is possible.
Regards,
Divraj
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
89 | |
7 | |
6 | |
3 | |
3 | |
3 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.