Operative indicators

Former Member
0 Kudos

Hi All,

Is there any way of u201Ccheckingu201D the three elements in the operative Indicators heading after the project has been released?

Regards,

Nitisha

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi,

You hve the option of having the account assignment element indicator ticked for all the WBS elements in the Project profile. Just tick the check box for 'All acct assignment element'. As far as the other 2 operative indicators are concerned you can maintain a substitution to have those indicators ticked. For e.g. In case you want to have these indicators ticked for the first level WBS element you can maintain a substitution as,

Prerequisite

PRPS-STUFE = '1'

Substitution

PRPS-FAKKZ = constant

PRPS-PLAKZ = constant.

Try this and revert.

Regards,

Gokul

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi Gokul,

Thanks for your reply.

The Problem is solved.

We can use the mass change function for changing all the 3 operative indicators. Though it will reflect on all the levels of WBS but still there is an option at least...i can try ur suggestion too once i get time..

Regards,

Nitisha