Hi All,
Is there any way of u201Ccheckingu201D the three elements in the operative Indicators heading after the project has been released?
Regards,
Nitisha
Hi,
You hve the option of having the account assignment element indicator ticked for all the WBS elements in the Project profile. Just tick the check box for 'All acct assignment element'. As far as the other 2 operative indicators are concerned you can maintain a substitution to have those indicators ticked. For e.g. In case you want to have these indicators ticked for the first level WBS element you can maintain a substitution as,
Prerequisite
PRPS-STUFE = '1'
Substitution
PRPS-FAKKZ = constant
PRPS-PLAKZ = constant.
Try this and revert.
Regards,
Gokul
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Gokul,
Thanks for your reply.
The Problem is solved.
We can use the mass change function for changing all the 3 operative indicators. Though it will reflect on all the levels of WBS but still there is an option at least...i can try ur suggestion too once i get time..
Regards,
Nitisha
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
89 | |
7 | |
6 | |
3 | |
3 | |
3 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.