Skip to Content
0
Aug 22, 2011 at 03:39 PM

IDES ECC 6.0 upgrade to EHP5

15 Views

Hi,

I got requirement to upgrade from ECC 6.0 to EHP5. but am having some doubts here

having C:/usr/sap--->is having 3 gb free space

D:/Oracle--->is having 25gb free space

E:/EHPI--->is having 200 gb free space (new drive)

1)So can i goahead with this free space?if i go how to proceed with EHPI?

2)if not possible with above space requirement then how can i gohead?

R/3:ECC 6.0

DB:Oracle 10.2.0.4

OS:windows 2003

Thanks,

Venkat