Dear Experts ,
I have made a new control key (pp05) with the setting of confirmations blank i.e confirmation possible but not necessary, to tackle a new scenario . I have put this new control key against two operations in a production order ,but while confirming the operations i cannot see the operations in the co11n screen whose control key have set pp05 ( the new one).
Hritesh
Hi,
In OPK4 in the third tab (Operation individual entry), in the selection field Check + confirmable Operations.
then all the operations in the routing will be displayed in the CO11N
Thanks,
JK
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
HI JK,
Thanks for your valuable input , i did the config .It worked .Can u tell me is there any way we can neutralise the quantity check between the operations with the new control key (pp05). The quantity check should be there for the other control keys .
Please give me some inputs if u can . It would be highly valuable to me
Hritesh
Hi,
sorry for the delayed reply.....
What are the parameters you have activated for the new control key, for example scheduling, costing etc...
and what are the quantity chec kyou want to accomplish, like the qty entered in the operation should be carried over to the next operation like that?
Pl let me know the details.
Thanks for your time
JK
Hi,
System s not propsing because your control key says confirmation is optional.
Howvever if you manually input the operation number, you should be able to post the confirmation for the same.
Regards,
Santosh Sarda
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
110 | |
12 | |
11 | |
6 | |
5 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.