Manipulate Valid from/to dates of alerts from macros

Hi All,

I am generating shortage alerts with a macro. Can I change the valid from / to dates?

Thanks in advance,

Ádá

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • author's profile photo Former Member
    Former Member
    Posted on Aug 22, 2011 at 07:57 PM

    Hi,

    When you generate alerts from macro thealert valid from is depend on macro Time Unit.i.e if you select a macro with Time Unit

    "Total planning horizon" then alert valid from is start of the Planning horizon.

    Regards,

    Sunitha

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Aug 22, 2011 at 10:39 PM

    Hello,

    Do not quite get your meaning, but I think alerts' calculation's start/end date is controlled in the macro step.

    You specify from which bucket to which bucket should the alerts be generated by defining the iteration start and times.

    Best Regards,

    Ada

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.