Dear Sir,

In MTO, after MRP run, during the conversion of planned order to production order, how system detect the production order type automatically if I have more that one production order type.

Thanks and Regards,

Chetan

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi,

In customization for MRP, you define per plant the default order type for conversion of planned orders.

Former Member
0 Kudos

I have checked the seetings. Pro order type PP01 is assignned. But when I am converting the planned order to prod order system takes the order type as PP05(Prod.Sched.Profile is not assigned in material master).

mashfaq
Contributor
0 Kudos

Dear,

Kindly check transaction OPJ9. Here select production scheduler is assigned to production scheduling profile which is maintained in material master.

Thanks

Muhammad Ashfaq

former_member184655
Active Contributor
0 Kudos

Dear Chetan,

1.Check if the production scheduling profile/production scheduler has been assigned in the material master.

2.If only production scheduler has been maintained means,then in OPJ9,check whether this prod.scheduler has been linked to

prod scheduling profile(through which the default order type can be set),if only prod scheduling profile means then directly check

in OPKP for this profile what is the order type.

3.IF no prod.scheduler/prod scheduling profile has been maintained means check whether any MRP group has been assigned in

MRP1 view which has the default production order type settings in OPPR.

Check and revert back

Regards

Mangalraj.S

Edited by: Mangalraj.S on Aug 22, 2011 12:37 PM

Former Member
0 Kudos

Dear Mangalraj,

Yes, It is flowing through the MRP groups. Thanks for the guidance.

mashfaq
Contributor
0 Kudos

Dear,

Kindly check transaction OPPE and maintain order type for conversion against both production order and process order.

I hope this will solve your issue.

Thanks

Muhammad Ashfaq

Answers (2)

Answers (2)

sundaresan_velayudam
Active Contributor
0 Kudos

Dear ,

Please check OVZG setting for requirement class ( check based on your stratergy) , check whether any order type is maintained or not?

mashfaq
Contributor
0 Kudos

Dear,

While converting planned order into production order system fetch order type from production scheduling profile maintained in material master. kindly check production scheduling profile in OPKP.

Thanks