Hi,

We create maintenance orders in PM and a reservation is created for materials in stock. Now the materials need to be send to certain delivery address. Is it possible to create an outbound delivery for a PM order, and when the good issue is posted the reservation gets settled? When we have a delivery for the goods when can also create a shipment and transport the goods to the delivery address.

I can't find it anywhere in PM or in Logistics Execution. For PS I have the process running (via tcode CNS0). Is there any possible solution for above requirement or is there another standard SAP porcess to get goods deliverd at a maintenance location. FYI Our maintenance locations are not plants, so a Transport order between plants is not the solution.

Thanks in advance for your responses.

Regards,

Roel

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • author's profile photo Former Member
    Former Member
    Posted on Aug 22, 2011 at 09:40 AM

    Hi,

    It is available in standard

    In maintenance order under component tab option available

    Put material and then select material row and then click on ADVANCE SHIPMENT(Icon truck)

    Then in pop up window enter sales document type and click on material from material over view and save order

    Then system will create sales order then create delivery with reference to sales order

    Kapil

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Aug 22, 2011 at 09:59 AM

    Hi Kapil,

    Advance shipments is only working with Service Orders, which is externally oriented. I need Deliveries within Plant maintence.

    Regards,

    Roel

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.