Understanding Target Cost Version Differences for 0 and 1 for process order

Our client need to understand the differences between our target cost versions that are utilized in calculating the process order CO03 cost analysis. When should each target version be used and why do the variances change? See example below.

Target Version = 1 Target Cost Prelim Order Cost Estimate

Version = 0 Target Cost for Prod Variances

Can you please provide analysis and help me on this.

I higly appreciate for your help.

Thanks in advance.

Seshadri

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Posted on Aug 23, 2011 at 08:40 AM

    I recommend that you post this in CO forum.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.