Hi,
The scenario is MTO, requirement is if sales order with big lot is inputted, then after MRP run instead of single planned order - number of planned orders to be created with sequential scheduling according to max lot size entered in material master.
I tried to select "lot size with rounding" under MTO lot in EX lot size procedure configuration, now planned order is splitting and all start date is same but I want to have scheduling sequentially like for 20th 1 planned order, 22nd 1 planned order, 24th 1 planned order....... according to max lot size till the Big lot is planned. Require in backward scheduling.
Thanks
B C Gudageri