Dear All,

I have two plants 1 and 2 use same material A. All requirement from plant 2 is be transfer to plant 1 by special procurement.

1. Plant 1 require 3000 A, plant 2 require 5000 A. I by 8000 A from vendor to plant 1 and after that I transfer to plant 2. It's ok.

2. Plant 1 use all 3000 A, plant 2 use 2000 A. So, in stock of plant 1 has 3000 A.

3. Plant 1 require 3000 A, plant 2 require 0 A.

4. When I run MRP, SAP generated PR with 3000 A for plant 1.

How can I config to SAP require transfer 3000 A from plant 2 to plant 1, because I do not want stock so much.