How to configure the shelflife time for the batch received from the subcontractor
Reason is under one batch i will be have different Material like Material B.Material D,Material F
where Material A,Material C, Material E. were raw material for Material B, D,F
Shelf life time should be given for the batch after receiving from vendor 90 shelf life time????