Hi,

I have two problems as under:

1) While attaching Material & BOM to the Activity then it doen't check if the BOM is marked with Inactive, Deletion Flag. No Message, Warning or Error is displaying.

2) While attaching Material & BOM (say Alternative 2) then at the time of MRP run (MD51) which Alternative BOM system will consider? Whether Alternative 2 as assigned or As per the BOM explosion rule ?

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • Posted on Aug 11, 2011 at 06:52 AM

    if you are using production version, then it will be considered based on the production version.

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Aug 16, 2011 at 04:37 AM

    We don't use Production Version.

    Anybody pls. answer.

    Anybody pls. answer.

    Edited by: hr-hr-hr on Aug 19, 2011 6:06 PM

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.