Hi Experts,

In my company I have 1 scenario where Sheet is a Raw material. After doing operations in 1 sheet (RM) 10 Finished Product are produced.

So please can anybody help me to create BOM for FG as from 1 same Sheet (RM) 10 different Fgs are produced.

Regards,

Uttam

Accepted Solutions (0)

Answers (4)

Answers (4)

Former Member
0 Kudos

Uttam,

Do you always produce 10 different FG's from single raw material sheet? or it is just a possibility to use same raw material in different FG's.

You can maintain independ BOM with sheet materiila as a compoenent . hope you have exact measure of qty you need in each BOM.

If all the FG's are produced together then go with co-products.

Regards,

Santosh Sarda

Former Member
0 Kudos

As suggested in other answers, it would be either be a co-product or by-product scenario assuming you always get 10 FGs in every scenario. What is the demand planning approach? FG with demand would need its own BOM (with co/by products) accordingly. At the max, you would have BOM for every one of these FGs.

Former Member
0 Kudos

Yes you are right but do you have any another options for doing this sceanrio?

Regards,

Uttam...

abhay_kapase
Active Participant
0 Kudos

Hi Uttam,

JK has suggested rightly to use it as Co-Product.

The other option would be to make it a by-product.

The difference between co and by product would be cost calculation.

If you could tell us what you are looking for or how you want your scenario to be, then it will be easy for us to imagine your scenario and then guide you.

Regards,

Abhay Kapase

Former Member
0 Kudos

Hi,

As suggested, you can also go with by-product,

In the order component or in the BOM, you can enter the material FG2 to FG10 in the negative sign, so you can do the GR for the FGs while issuing the material Sheet in MIGO.

thanks

JK

Former Member
0 Kudos

Hi,

If you have FG 1 to 10, by processing sheet RM1.

Create Material master for FG1 to FG2, with coproducts indicator and assign apportionment structures.

Create a BOM for FG1, in which assgin the Sheet RM1, and assign all the FG2 ot FG10 mateials with negative qty.

So while doing GR for FG1 all the materials from Fg2 to FG10 will also be taken into the stock and RM will be issued to the order.

Thanks,

JK