on 08-08-2011 3:17 PM
Dear Gurus,
We have categorized types 3 plant,
A Plant (Centralized),Quality inspection is activated,
B Plant (Manufacturing) NO Quality inspection and
C Plant (Selling) Quality Inspection for few materials eg(some finish goods are kept under quality inspection for 2 days).
All the incoming materials And outgoing materials are from *centralized plant are quality activated*.
Process is after conformation of production orders in Plant B material is transfer unrestricted stock from there Transfer posting is done to Centralized Plant A Quality Stock where i have activated quality (08 inspection type These material under goes quality inspection for 2 days After that result and UD made for this lot).Due to shortage inventory area Some quantity of the Finish Goods are transfer to selling plant which for away from the centralized plant after quality clearing it one to transprot to selling plant Which client to not want to waste.
Client Condition
1 Material has to under go through plant A.No direct transfer posting to Selling Plant C from Manufacturing plant .
2 Keep in Quality control Stock for Material in both the Both Plant for 2 days.
My Requirement :
How to transfer the partial quantity of goods under quality period from lot to another plant ,ie plant.
Kindly replay
Thanks & Regards,
Darvesh.
Can any one provide me solution for this Scenario.
Thanks & Regards
Darvesh
Edited by: shoib.bs on Aug 10, 2011 6:21 PM
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Sobis
As far as i have understand ur secenraio. you can go for stock transfer inspection.
Material is produced in plant B where no quality is activated so produced quanity goes to unrestricted here and no lot would be created so i donot think that you hve to split the lot. So while transfering the stock from plant B to A and C of required quanity, lot would be created if stock transfer inspection is activated for that material at plant level A and C .
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Manish,
Thank for Replying...........
There is no direct transfer posting Between plant B to Plant C.
All the Incoming and outgoing materials has to go through plant A which is Quality Activated.
I enable to understand how to do Transfer Posting for partial Quantity Stock laying in quality with inspection lot to Plant C Quality Stock ?
Can Please explain me step by step.
Awaiting for Reply
Thanks & Regards
Darvesh
Have you explored QAC2 t code
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Sujit,
Thank for Replying...
Yes i have explored through the qac2 tcode,
But problem is i have to split the quantity of that lot for eg 100kg has to be split as 60kg in Plant A and _40 kg has to be posted to plant C.Both must be under quality Stock & Control for 2 days._
Awaiting for Reply.
Thanks & Regards
Darvesh
User | Count |
---|---|
88 | |
7 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 | |
3 | |
2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.