on 08-08-2011 9:59 AM
Hi
What is the link between subcontracting p.o and B.O.M
Thanks
Hi,
The link between subcontracting p.o and B.O.M is item category "L " where you can Explode BOM.
Regards,
Biju K
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi all
Thanks for all the replies.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
the link is the reservation in RESB table
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
the bill of material is stored in tables MAST and STKO and STPO
if you create a subcontract PO, then SAP is using the material number and searching for the bill of material is read and the needed components are copied into RESB table.
So in general the material number is the main link to the BOM.
If you have several BOMs and use alternative BOMs for subcontracting, then you find the BOM via production versions. this field is maintained in the info record.
But the BOM becomes always PO specific, as it is copied to the PO. A change in CS02 will not effect the open PO.
You can even create a subcontract PO without having a BoM in your system, you then enter the components manually in ME21N detail material tab. then these components are stored in RESB only.
In Sub contracting process you are required to send components to Vendor for processing of finished product.
While creating sub contracting po you are required to maintain components in materail tab of PO required to be sent to vendor for processing of finished product. These can be maintained in following ways :
1) Manually in the PO.
2) Automatically thru BOM of finished product.
Regards,
Sanjay Kohli
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
It is Item Category "L" at PO Line Item level which asks for BOM fo the material at that line item and this decides the PO as Subcontracting PO.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
HI,
Subcontracting PO:
Sending materials to the subcontractor for any further processing or assembling with item category L PO has been created.
BOM:
Bill of Materials is used in production to get a finished product from the list of materials required to prodcue.
The link is we are sending the list of child materials to the subcontractor by using BOM.
Regards,
BK
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
IN subcontracting PO,U suppply the child parts & receive the parent part
That is u supply multiple components & receive them as single piece.
So u have to create BOM with parent material in CS01 & give the subcomponents
while creating PO u have enter L in item category & parent material.the BOM will explode showing the child parts
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.