Skip to Content
author's profile photo Former Member
Former Member

Engineering change management - upload.

Hi all,

Did anyone had an opportunity to work on the data upload

For ECM (engineering change management).

If so can you please let me know , by which method used for this, i mean LSMW or CATT.

if by program then Recording or call transaction.

please give me few hints.

thanks

satheesh

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • Posted on Jan 31, 2005 at 11:54 AM

    Hello,

    For ECM data migration, you may try out LSMW via IDocs. Message Type: ECMMAS.

    You can also do it by recording. But you may have to check the individual cells of the table control of the 'Object Types' screen.

    Hope this helps you.

    Regards, Murugesh AS

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.