Skip to Content
avatar image
Former Member

Schedule lines not generated after MRP run

Dear All,

I am trying to create Schedule lines through MRP run , but instead system creates MRP element PRqRel and its PurRqs when i check in MD04 , the following are the prerequisite i done before MRP run , but still Schedule lines are not generating.

1.activated checkbox source list in material master.,Procurement type is F, MRP type PD , lot size MB , marked JIT Scheduling indicator as 1 in Pur view of material master , no MRP group is used in our process.

2.Maintained Inforecord.

3.Maintained source list for the material and marked MRP relevant as 2. Validity also checked.

4. Quota arrangement for this vendor only.

5. Created New scheduling agreement.

6. Material is not sent for subcontracting.

7. Ran MD02 with following parameters ,

Processing key NETCH Net Change in Total Horizon

Create purchase req. 1 Purchase requisitions in opening period

Delivery schedules 3 Schedule lines

Create MRP list 1 MRP list

Planning mode 3 Adapt planning data (normal mode)

Please let me know if i am missing something

Thanks in Advance

Benny

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

3 Answers

  • Best Answer
    avatar image
    Former Member
    Aug 05, 2011 at 12:02 PM

    Did you created the source list through ME01 and marked it MRP revelant as 2-Record relevant to MRP. Sched. lines generated automatically.

    Add comment
    10|10000 characters needed characters exceeded

    • Former Member Former Member

      Yes it has the SA number in it , i have already referred few threads in SDN for the same issue and i had done all the prequisites whatever needed to generate the Schedule line , but still nothing works.

  • Aug 05, 2011 at 12:39 PM

    Hi Benny,

    Please also check the validity period in the SA header and the validity period of the price. The former shall cover the delivery date of the PReq that you got in MD04; the latter shall cover the date which is controlled by the field "Pr. date category" in the item details of the SA (press Shift-F5 Additional data).

    BR

    Raf

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Aug 17, 2011 at 03:10 PM

    Closed

    Add comment
    10|10000 characters needed characters exceeded