Skip to Content
author's profile photo Former Member
Former Member

Infopackage error

We have a connection from SAP/EBP to SAP/BW.

In the Quality (or Test) system We refreshed SAP/EBP with data and customizing from Production.

After this operation we have trouble with some extraction processes, in particular with the Inforource that had a INIT before the refresh. In this situation we need to delete the old INIT but if we try to enter into the infopackage the system give the error RSM1_CHECK_FOR_DELTAUPD. Anyone known a tournaround metod for delete the Init or other specific solution for this trouble.

We find a referrement to note 419923 that is not available.

Thanks

Fabio

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on Feb 01, 2005 at 10:28 AM

    Check if there still exists an entry for this Datasoruce in the delta queue (RSA7) in your source system. If so, delete and try again...

    The only other way i can think of is manually modify the entries in tables ROOSPRMSC and ROOSPRMSF in your source system. (these contain the init-selections per DataSource)

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.