on 08-01-2011 5:58 AM
Hi,
While creating halb material with valuation catergory Y,System select price control V,
I wish,it should be S, as after cost run value updated with standard price.
Regards,
Devendra
Dear
Kindly follow the menu path SPRO>Logistic general >Material master >Basic setting>Material types> Define attributes for material type and go to in detail of your respective material type and in valuation tab set price control S standard price.
Thanks
Muhammad Ashfaq
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
HI,
Thnaks for your valuable input,
Devendra
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
hi,
i have to move this thread to MM Forum,
How could be follow?
Devendra
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
I am not sure about moving thread to other forum since I don't find any such option in our purview. You can check the option to contact moderator who has right to do the same.
Also you can try with creating new thread in MM forum and close this thread here in PP forum thereby you can avoid duplication.
Regards,
Tejas
User | Count |
---|---|
110 | |
12 | |
11 | |
6 | |
5 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.