Dear Experts,
At the moment I am not able to influence the cost centre out of a 201 WM movement, whereas I believe this should be possible in standard SAP. I want to do 201 movement in WM , which should trigger movement 201 in IM.
I tried below scenario :
1. LT01 : create TR with WM movemnt type 201 and with specifying cost centre 51000 (K) as requirement tracking.
2. This puts the stock into storage type 911 , bin 51000.
3. But u2013 and this is something that puzzles me at the moment, how to get this out of 911 ?
4. With LI21 , a material document is created and the bin is cleared
5. But the movement type is 711 (I would rather have 201)
6. The cost centre is 41002 ( any cost centre assigned via OKB9 )
o At the same time, I am pretty sure that it is possible by standard SAP to influence the u201Crealu201D costcentre in the IM document
. Why would there otherwise be the possibility to specify this cost centre in the WM movement at LT01 ?
Precisely, I am looking to achieve below:
1) We push manually the stock to 911, 51000 (via LT01 or even LT10)
2) When clearing 911 51000, that same cost centre is appearing in the material document
Kindly advice how to achieve this.
Regards,
Abhijit