dear consultants,

In my case customization done for exclude mrp from storage location at plant level,but it is not reflecting in mdd04 screen ,

Pour some ideas in this topic,

Thanks in advance

venkat

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi,

Check this thread:

venkat_v
Participant
0 Kudos

My isuue resolved i am closing this thread

Edited by: venkatvasu on Nov 24, 2011 6:59 PM

Answers (3)

Answers (3)

former_member186193
Active Contributor
0 Kudos

Dear,

Goto SPRO>Production>Planning>Define Storage Location MRP per plant, add the storage location to be ignored during MRP and select indicator '1' against it. or Go to T code OMIR and do the same. This way you can maintain the storage location which will be removed from MRP run.

But you cannot see the storage location you have removed from MRP run.

Also check MMSC for material number wise.

Regards,

Alok Tiwari

former_member186193
Active Contributor
0 Kudos

Dear,

Goto SPRO>Production>Planning>Define Storage Location MRP per plant, add the storage location to be ignored during MRP and select indicator '1' against it. or Go to T code OMIR and do the same. This way you can maintain the storage location which will be removed from MRP run.

But you cannot see the storage location you have removed from MRP run.

Regards,

Alok Tiwari

Former Member
0 Kudos

Hi,

If you exclude a storage location from MRP, the stocks in the storage location will not take into account for MRP.

As MD04 is concerend, it will shows the total stocks available and the requriements created by MRP.

Just enter Storage location indicator as 1 in MRP 4 view of material master. Then check MD04

Also check in MMSC for the storage location, it is excluded from MRP.

Thanks,

JK