I am new to SAP but need some help with sales order acknowledgements.

We have set a replenishment lead time on our manufactured items so that when a sales order is input the date confirmed by the ATP can be used. However this does not up date in the sales order screen and as such will not print on an order acknowledement.

The plan is then to plan production to suit the order input and we need to be able to use the planned production date to acknowledge to the customer.

Any help would be much apprciated.

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Posted on Jul 21, 2011 at 03:15 PM

    In t.code OVZ9, for the availability check rule (you can find in the material master) and checking rule (A for sales order), uncheck the box Check without RLT and save. Then crate a new sales order and check. The system will confirm delivery date based on RLT set in the material master.

    Regards,

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.