on 07-21-2011 12:36 PM
Hello Experts,
I created a recipe with only one single operation and assign control key PP03 to it, when process order confirmation, there is not auto GR.
And then I add same resourse to this recipe as a phase, and also use control key PP03, this time auto GR happened.
May I understand that system only read the last phase control key to decide auto GR or not?
Thank you in advance.
Richard
Dear Richard,
The last operation should contain a phase along with a control key set for auto GR,and only after maintaining this data in the
process order ,while confirming through CORK,under goods movements the system proposes the header material for 101
movement.
Check and revert back.
Regards
Mangalraj.S
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear Richard,
In the case of process manufacturing,A master recipe consists of a header and several operations, each of which is carried out
at a primary resource. An operation is subdivided into phases.A phase contains standard values for activities. These values
serve to calculate dates, capacity requirements, and costs.
For a process order, confirmations can be made for a phase or several phase or at order level.
So if you want Auto GR for a process order the system expects for a phase (for the last operation)with a control key with auto
GR while executing CORK(in case if no production scheduling profile is assigned)
Correct me if I'm wrong.
Regards
Mangalraj.S
Edited by: Mangalraj.S on Jul 21, 2011 6:05 PM