Hello Experts,

I created a recipe with only one single operation and assign control key PP03 to it, when process order confirmation, there is not auto GR.

And then I add same resourse to this recipe as a phase, and also use control key PP03, this time auto GR happened.

May I understand that system only read the last phase control key to decide auto GR or not?

Thank you in advance.

Richard

Accepted Solutions (1)

Accepted Solutions (1)

former_member184655
Active Contributor

Dear Richard,

The last operation should contain a phase along with a control key set for auto GR,and only after maintaining this data in the

process order ,while confirming through CORK,under goods movements the system proposes the header material for 101

movement.

Check and revert back.

Regards

Mangalraj.S

Former Member
0 Kudos

Hi Mangalraj,

Thank you for your reply.

Yes. I think it is standard system logic. But I cannot find it in SAP doc or material.

Richard.

former_member184655
Active Contributor
0 Kudos

Dear Richard,

In the case of process manufacturing,A master recipe consists of a header and several operations, each of which is carried out

at a primary resource. An operation is subdivided into phases.A phase contains standard values for activities. These values

serve to calculate dates, capacity requirements, and costs.

For a process order, confirmations can be made for a phase or several phase or at order level.

So if you want Auto GR for a process order the system expects for a phase (for the last operation)with a control key with auto

GR while executing CORK(in case if no production scheduling profile is assigned)

Correct me if I'm wrong.

Regards

Mangalraj.S

Edited by: Mangalraj.S on Jul 21, 2011 6:05 PM

Former Member
0 Kudos

Hi Mangalraj,

Thank you. Now I'm more clear about this. Points rewarded.