cancel
Showing results for 
Search instead for 
Did you mean: 

DIP profile with Material Validity period

Former Member
0 Kudos

Is it possible to control one Material for a certain Period from the Material determination in RRB DIP profile.

Please let us know how to do.

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi

It can be

Select characteristic PERIOD and TICK MARK to material determination then same will be appear in material determination CRITERIA then there you should maintain set

and in set maintain period which you want and exclude period which you don't want.

Kapil

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi kapil, It is working fine, thanks