Skip to Content
author's profile photo Former Member
Former Member

Process Chains in BPC

Hello Gurus,

While creating a process chain, I see that we have to use the BPC delivered Process Types. One of these is "Modify Dynamically". However, I noticed that in the variant for the "Modify Dynamically", we do not specify any parameters (based on the example in the HTG found on this forum).

Could somebody please explain me the use of the "Modify Dynamically" object in the process chain?

Thanks for your help.

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Posted on Jul 21, 2011 at 10:49 AM

    Modify Dynamically takes parameters provided by DM Package and provides them to BPC Process Types in Process Chain. So, if you have BPC Process types in your Process Chain you need "Modify Dynamically" otherwise you don't.

    Hope this helps,

    Gersh

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.