Hi All,

Does anybody know how to enable parallel process in data extraction?

I need to extract COPA data from SAP ECC 6.0 to SAP BW 7.0 and I want the data to be extracted in parallel. It is my knowledge that in SAP BW 7.0 I cannot set it via menu bar (please see below screen cap).

http://i144.photobucket.com/albums/r171/Spinnnzzzz/RSA1.jpg

So I looked around and found info about RSBATCH TCode. I set the LOAD_NEWDS process type to have 10 parallel processes. This created an entry in RSBATCHPARALLEL table (please see below screen cap). But when I run the infopackage the there's only 1 job created.

Please do share some insight. Thanks

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • author's profile photo Former Member
    Former Member
    Posted on Jul 20, 2011 at 01:35 PM

    Hi Andry,

    Goto SBIW transaction in ECC and you will be able to set the no. of parallel processes in source system extraction parameters option.

    And if you want to change this setting from BW then goto InfoPackage settings. There also you have the option to set no. of parallel process for extraction.

    Regards,

    Durgesh.

    Edited by: Durgesh Gandewar on Jul 20, 2011 7:05 PM

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member Former Member

      Hi All,

      I finally found a way to set the extraction to run in parallel. SBIW TCode applies for SAP BW 3.5, while I use SAP BW 7.0. In SAP BW 7.x, the control is determined by SMQS. (as mentioned in SAP Note 1163359).

      Based on this knowledge, I set the Max.Conn. to be 10 and run the infopackage again. But I encountered unexpected result. After I set the Max Conn to 10, the extraction took longer than when using previous setting (Max Conn = 2). I monitored the Process Overview (SM50), and it seemed that the extraction does not use all dialog process that I have set (10). The max I ever got was 5 process running in parallel. Please see below screen cap

      [SM50|http://i144.photobucket.com/albums/r171/Spinnnzzzz/SM50.jpg]

      I have looked at SAP Note : 977283, 995057, and 1051445 but all the corrections mentioned in the notes have been implemented in the ECC and BW systems I use.

      So basically I succeed in making the extraction running in parallel, but the performance is not getting better. Does anyone know how to resolve this?

      Btw, I'm curious. I extracted 942,275 records in approximately 2,400 seconds (with max conn = 2) . Is it slow?

      Edited by: Andry Tjiajadi on Jul 21, 2011 2:53 PM

  • author's profile photo Former Member
    Former Member
    Posted on Jul 20, 2011 at 02:34 PM

    Hi,

    Probably the issue might be due to due to non background user trying to run the job in background.

    you may use su01, and change the user type in tab 'logon data', set the type to 'system' or 'background'. ask basis help if you have no authorization to do so

    Thanks,

    Gaurav

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.