Dear Gurus,

I am creating a project with 6 WBS elements. When I am creating internal activity then my control key is PS01.

My requiremenet is that only for 1st WBS of every project, my internal activity should be ZPS1 and for remaining it would be PS01. Is it possible through substitution ?

Please guide

Keshav

Accepted Solutions (0)

Answers (3)

Answers (3)

Former Member
0 Kudos

Hi,

SPRO >> PS >> Structures >> Operative Structures >> Work Breakdown Structure (WBS) >> Define Field Selection for Work Breakdown Structures >> Field Selection: WBS Element >> F2

Here define the 6 levels of WBS as per your requirement.

And in substitution, try to add control Key as fixed value for WBS level 1.

I am not sure it will work, but have a try

Regds,

CB

Former Member
0 Kudos

Dear Sreekanth,

That is not only for a particular project. Its for all the projects that 1st WBS should have internal activity with control key as ZPS1 and for remaining it should be PS01.

Regards

Keshav

Former Member
0 Kudos

Hi,

In this case you have to identify if there is any unique characteristics (any specific field or any specific name) for the 1st WBS Element in a project and use it for the pre-requisite. And then try to do the substitutionfor control key.

Regards

Sreekanth

virendra_pal
Active Contributor
0 Kudos

Create your network based on WBS and not on project defintion

Change the network type for the 2nd WBS onwards with PS01 key

Former Member
0 Kudos

Dear Gurus,

please reply

Keshav

Former Member
0 Kudos

Hi,

Identify a unique number for this one activity (this may have to be part of process) and then use this activity number as reference for the substitution.