Hi Expert,

While im doing cost estimate with t.c ck11n , the following error is coming.

No itemization exists for material 92200 in plant 1001

i checked kp26 planing...........plan price is available.

i checked the BOM and ROUTING..........

But still im getting the error....

Please help me how to resolve....

in the error log im getting the following messages.

1) no object was costed.

2) Cost component split costed with value of zero

Accepted Solutions (0)

Answers (3)

Answers (3)

Former Member
0 Kudos

Has this been resolved now?

Former Member
0 Kudos

Not yet resolved........ we are controlling the bom and routing through ecm..

former_member588855
Active Contributor
0 Kudos

What is quantity in the BOM and price in KP26?

What is the costing lot size?

Increase the costing lot size and check.

Regards,

Divraj

Former Member
0 Kudos

Hi thank you for reply,

I increased the lot size......still im getting the same error.

in error log im getting the follwoing errors.

ck060- object not costed.

ck240 ...cost component slitt valued with zero value.

Former Member
0 Kudos

Dear Ram,

Normally, you need to check the valuation price and the strategy for the Material costs in the valuation variant.

Kind Regards

Umapathi G

former_member588855
Active Contributor
0 Kudos

Check whether the BOM is getting exploded or not in the quantity structure tab.

Regards,

Former Member
0 Kudos

Hi,

Bom is exploded in QTY STRUCTURE BUT ROUTING IS NOT.

former_member588855
Active Contributor
0 Kudos

It seems ck240 is a follow up error of ck 060.

Check whether the routing is existing for the material. Do the necessary rectification and provide feedback.

regards,

Divraj

Former Member
0 Kudos

Hi divraj,

I noticed that in BOM there is no validy date from and to validity date ,,,,,,,,,,,,,,, is it reason for that error........

Former Member
0 Kudos

Hi Umapathi ,

I checked that every thing is fine,,,,,,,,,,

But in BOM there is no validity date ..........wether it will effect the std cost estimation.

Kindly reply

Former Member
0 Kudos

You need to add BOM validity dates. That should resolve your issues.

Also, the error 'Cost component split costed with value of zero' means that SAP encountered enough error messages and cannot calculate a product cost estimate. You will usually also see message CK 060 'Object not costed' at same time. So these messages are products of the error and not helpful in determining the error.

Former Member
0 Kudos

What is the number of BOM and KP26 price? What is the cost of lot size?<a href="http://www.tera2buy.com/tera2buy.items">Tera Items</a> Increase the size and cost a lot of checks...

Former Member
0 Kudos

Hi Umapathi Naidu,

Here we are using ECM perameter contol for BOM and ROUTING, so we can not use validity date for BOM and ROUTING,

So please help me in this situation what is the additinal settings are required to get std cost estimation.

Former Member
0 Kudos

Hi Gurus,

Im awaiting ,,, please update

Former Member
0 Kudos

Hi,

Please check the setting in Material Origin in the Costing 1 view of the Material Master.

Regards,

Kiron Kumar T.

Former Member
0 Kudos

HI SIR,

I have seleced Material origin in material master costing view.

Former Member
0 Kudos

Hi,

Please check the below link:

Thanks and Regards

Binoj M D

vivek_srivastava12
Active Contributor
0 Kudos

Hi,

Please check if cost exist for raw materials or it there is any SFG in BOM then its Cost Estimate is created.

Br,Vivek

Former Member
0 Kudos

Hi,

Raw material having cost,,,,,,,,, Bom does not contain any SFG,,,,,,,,,,in operations control key is fine.

ck060 error message is coming .as object not costed

and

ck 240 cost componet split valued with zero value..........