Reg....MRP Run Materials

Dear Friends

i have 300 finished materials now i updated forecast for 50 materials in MD61 and i am going to run MRP in MD01.

How can i get MRP run list only for these 50 materials

pl guide me

Thanks

selva

Add a comment
10|10000 characters needed characters exceeded

Related questions

6 Answers

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Jul 19, 2011 at 12:15 PM

    Dear,

    Please use the following steps to achieve the result.

    1. Create New MRP Controller in OPPQ, MRP Controller

    2. Assign the all 50 materials to a new MRP controller

    3. Change the PIRs in MD62

    4. Run MRP

    5. Check the results in MD06, With Plant and MRP controllers as the input.

    Hope this solves your issue.

    Regards,

    Ashish

    Edited by: Ashish02 on Jul 19, 2011 5:45 PM

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Jul 19, 2011 at 04:20 PM

    Dear Selva,

    1.Is your requirement to get the MRP list for the 50 materials after MRP run or else to run MRP only for the 50 materials for

    which demand exists?

    2.If your intention is to run MRP only for the 50 materials means you can activate MRP run user exit(M61X0001) and run MRP

    based on MRP controller.

    3.If your requirement is to get the MRP list for the 50 materials,you can check this report MDLD or else from MD06.

    Regards

    Mangalraj.S

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Jul 19, 2011 at 09:21 AM

    Hi,

    I think you can get in MD05 t-code as collective based on the different selection methods..This is the T-code called static where it will store the actual MRP run results.

    in tables like MDKP,MDTB you can get..

    DELETED: Don't ask for points

    regards,

    Ravi

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Jul 19, 2011 at 10:43 AM

    HI,

    Use MD 06 with Various selection criterion. you can check the MRP results with MRP / processing dates to filter the required materials.

    check and revert,

    Santosh Sarda

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Jul 19, 2011 at 11:42 AM

    Dear,

    In MD06 you can select various fields and get the result of 50 material. Or put the date range of the MRP run and see all the MRP relevant change to all materials.

    Hope it will help. Please revert back for further clarification.

    Regards,

    Alok Tiwari

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Feb 06, 2012 at 06:04 AM

    closed

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.