Tolerance Limits PP

Dear All,

I have maintained tolerance limits in material master as 5% for both over and under tolerance....But the problem is even if i maintain the production order as below or over 5% still its is accepting the production order n allowing to do confirmation and goods receipts....I want to stop this....Please suggest..

Regards,

Pawan Shetty

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Best Answer
    Posted on Jul 16, 2011 at 08:44 AM

    Dear

    Please go to the transaction code OPK4 ( Define confirmation Parameters ) .

    Select the option , General Validity settings . In the subscreen Checks , you will find the options for under delivery tolerence and over delivery tolerence . Please choose the correct option , whether under delivery & over delivery tolerence are allowed or not . errors etc.

    Please check and revert. Thanks

    Ayaz

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.