MRP 2 view - service level field

Hello colleagues.

Can anybody explain me what's the usage of the field "service level (%)" in the MRP 2 view of the material master ?

The SAP help does not help that much ...

Regards,

Fernando

Add a comment
10|10000 characters needed characters exceeded

Related questions

5 Answers

  • Posted on Jul 15, 2011 at 02:38 PM

    Service level is used by the system to compute the safety stock when such a MRP type is used.

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Jul 16, 2011 at 04:21 PM

    Hi Fernando - Service level is the desired probability that a chosen level of safety stock will not lead to a stockout. Naturally, when the desired service level is increased, the required safety stock increases as well.

    Service level is used to calculate the safety stock quantities when you use 'Dynamic safety stock Qty'. Higher the service level greater the qty in safety stock.

    Service level is maintained in percentage (%). The lower the service level, the lower the requirement for safety stock.

    Hope this info helps.

    Regards,

    Pradeep

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Jul 17, 2011 at 03:28 PM

    Hi,

    Service level % is used to calculate safety stock. The higher the service level, the higher will be the safety stock calculated by the system to compensate for additional consumption or delays in delivery.

    Hope it clear your doubt.

    Regards / US

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Jul 17, 2011 at 08:52 PM

    Dear,

    In MRP2 view thers is field service level % where you can define the percentage of present stock will be in safety stock.

    hope it will works for u

    Service level

    Percentage specifying what proportion of the requirement is to be covered by the warehouse stock.

    Use

    The system uses the service level to calculate the safety stock.

    The higher the service level, the higher will be the safety stock calculated by the system to compensate for additional consumption or delays in delivery.

    Regards,

    Alok Tiwari

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Jul 18, 2011 at 03:26 AM

    Luz,

    Service level is used to compute the safety stock, during MRP run.

    Regards,

    Sundhu

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.