Hi Guys:
IN SAP R/3
My client has requirement to merge planning of material for multiple plants and run the MRP under one head plant.
For example:
Plant : 1000, 1001, 1002, where plant 1000 is a head plant who had authorization to perform MRP run.
if I run MRP Sepeartely:Each plant has below requirement for one material number (M1)
Plant 1000 : 3 EA
Plant 1001 : 2 EA
Plant 1002 : 5 EA
Instead of running MRP per plant, my client needs to run MRP for multiple Plants that Consolidate total requirement for all plants.
and generate PR--->PO , In the PO, M1 should be delivered to 3 different plant locations by vendor and Po Will be issued from Head Plant 1000?
Is there any Report in SAP , Where MRP Controller can See Requirements from Different Plants @ Central Purchasing level after one Multi Plant MRP run, So that he can decide on how much to allocate to each plant?
Thanks for help
Thanks
Sweth