Hi, I'm working with PM module in SAP, and we are wondering if its possible to do the following action.

We already have all the maintenance plans, and in most of them we have several maintenance items that refer to different equipment of the same machine. Even thought all of this items have the same frequency, because of the short time we have to complete the maintenance plan, must of the time we are unable to finish all the WO generated. So we were wondering if its possible to move the scheduled plan of some of the maintenance items within the maintenance plan so we can have a correct control con the activities that we've already make?

To register these maintenance I've tried to create a manual call only for the maintenance items that were missing, but it generated a WO for all the maintenance items of the plan so this is not an option for me.

Hopefully you can help my

JL

10 |10000 characters needed characters left characters exceeded
* Please Login or Register to Answer, Follow or Comment.

0 Answers