How can we publish/schedule a PowerPoint report?

Dec 15, 2016 at 01:59 PM

17

avatar image

We are on BOBJ 4.1 SP6 and Analysis for Office 2.3

We have been able to add the Analysis tool bar into Powerpoint and this is letting us insert BEx Queries into the slides directly.

I am then able to save this back to BusinessObjects BI Platform and we can view the Powerpoint in both Launchpad and CMC.

However, with Excel Analysis for Reports we can then right click in Launchpad/CMC and set them a schedule to run as required however I am not getting this option with the Powerpoint - does anybody if this is a possibility we are looking to SP8 is this featured added in the new service pack?

10 |10000 characters needed characters left characters exceeded
* Please Login or Register to Answer, Follow or Comment.

1 Answer

Kuldeep Ghosh Dec 15, 2016 at 05:02 PM
0

I dont think there is a option to export to powerpoint.