cancel
Showing results for 
Search instead for 
Did you mean: 

How can we publish/schedule a PowerPoint report?

Former Member
0 Kudos

We are on BOBJ 4.1 SP6 and Analysis for Office 2.3

We have been able to add the Analysis tool bar into Powerpoint and this is letting us insert BEx Queries into the slides directly.

I am then able to save this back to BusinessObjects BI Platform and we can view the Powerpoint in both Launchpad and CMC.

However, with Excel Analysis for Reports we can then right click in Launchpad/CMC and set them a schedule to run as required however I am not getting this option with the Powerpoint - does anybody if this is a possibility we are looking to SP8 is this featured added in the new service pack?

Accepted Solutions (0)

Answers (1)

Answers (1)

former_member198519
Active Contributor
0 Kudos

I dont think there is a option to export to powerpoint.