Pland. ord for items that are planned at ECC are auto Allocated to Resource

Hello,

We have items that are planned in the ECC not in APO. The Items are mrp type "PD" in ECC since they usually open manually prod.orders for these items. They have a PDS in APO .These prod.orders are scheduled in APO using the planning board. But, sometimes planned ordres are created in the ECC in the planing run. These planned orders are aoutomatically scheduled (allocated) at the resource. We would like to avoid it. Any idea how?

Thanks you,

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on Jul 07, 2011 at 01:41 PM

    Hi,

    These planned orders are allocated to resource based on whatever resource you have specified in planned order in ECC.

    So planned orders created through MRP what ever resources are selected on whichever date same will appear in APO.

    Do you want to pass ECC planned order to APO in deallocated status instead of in scheduled status.?

    In such case you can try modifying configuration of planning procedure in APO .

    Regards,

    Santosh

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.