Hi SAP experts,

Greetings to you all. I wish to ask a query that how batch is determined automatically at the time of goods receipt for production order .

I have done the following settings:

1.Specified batch level at material level

2.External batch number assignment

3.Defined production order condition table '501' (plant/material)

4.Defined production order access sequence (order type-plant -material)

5.Defined Production Order Strategy type.

6.Defined Batch search procedure in Production Order.

7.Assigned Batch search procedure to Production order type for a particular plant , batch check not activated.

Please let me know of any more settings to be checked for the same.

For example, a production order is being confirmed for a quatity of 5 nos . at a time . However, the GI movement (261 movement type) for the production order components is taking place for 1 EA qty. from 5 different batches.

So now, how the system will define the GR (movement type 101) for the production order header material for the qty. 5 nos. EA ?

It is desired that the system should do GR for the qty. 1 EA of the header material for the 5 different batches (batches which were automatically deteremined for the Goods issue of the components).

Thanks in advance. good day.

Best regards,

RB

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on Jul 05, 2011 at 08:06 AM

    Rahul,

    Since you are using external batch number , you have to assign batch number to production order header material in the production order assignement tab only.

    GR will happen in confirmation against the same batch number.

    you can not have multiple batches for header material as per compoenent batches against same production order. Each production order will have unique batch at header level.

    Regards,

    Santosh Sarda

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.