Costing data for maintenance orders

Significance of costing variant for planned costs,actual costs and result analysis key?

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on Jul 04, 2011 at 07:34 AM

    Hi,

    Under Assign Costing Parameters & Results Analysis keys, Costing Variants will be assigned to Plant & order type combination for planned cost & actual cost.

    Based on this assignment, costing calculation will be done at order level.

    Regards,

    Maheswaran.

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member Former Member

      Hi,

      For the combination of Plant & Order type, result analysis key will be defined. This RA key will be copied while creating the order for that order type & plant.

      While doing Period End Closing, WIP calculation will be done based on the status of the order & RA key.

      GO to OKG1, there you can find the SAP help in detail. This will be done by FICO people based on the valuation & period end closing activity.

      Else find Results Analysis Keys in IMG.

      You can get help in detail.

      Regards,

      Maheswaran.

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.