Authority Problems when trying to set a Project Status Switch in SolMan

Hi,

In the SolMan I have an authority problem with one user account. The role is to create a new project by using the transaction

SOLAR_PROJECT_ADMIN. In the register 'system landscape' --> 'change requests' are five possibilities to choose. When I display Project Status Switches to permit importing of requests in the target system, I get the information message I do not have the appropriate authorization needed. There is neither a possibility for a errorlog with SU53 nor to get some posivite results on tracing the funktion. The result of the SU53 is we don't have an error. The result of the trace is all sentences are 'green' and i have no authorisation problem.

While debugging the problem I get a sy-subrc = 4 and I don't know why.

We use SAP EHP 1 for SolMan 7.0.

Who might help?

regards

KRI

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Jun 29, 2011 at 01:14 PM

    Did you turn the trace on in SolMan or the satellite? You should turn your trace on in the other system, not Solman.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.