Material Master - Work Scheduling View - Serlevel 1

35 Views

Hi,

In Material Master, Work Scheduling View, for a specific plant I want to maintain SerLevel as 1 so that the Equipment Number and serial number are synchronous.

But the problem is that we already have stock for this part number in this plant as well as other plants with different Equipment Number and Serial Number.

Because of this, the system is not allowing me to enter the SerLevel as 1as the asynchronous is there for Equipment/Serial Number Combination.

Can you please suggest, how to synchronous this ?