cancel
Showing results for 
Search instead for 
Did you mean: 

billing document

former_member222080
Participant
0 Kudos

Note material is Configurable material and Strategy is Make to order with configurableT-CODE VF02

billing date 03.06.2011

NO STANDARD COST ESIIMATE COULD BE FOUND MATERILAL (check the attachment)

in sale order

Pricing date 11.03.2011

Purchase order 09.03.2011

there are two items inthe sales order

our billing document for item 10 (material code is available in attachment)

steps taken

1.check MM03 costing 2

cost estimate not found

My requrement is

In material master MM02/mm03 in the costing tab cost estimate should be updated

I want do the billing

In OVZG costing data

sales order costing,automatic costing and marking,costing method -product costing

Accepted Solutions (0)

Answers (1)

Answers (1)

jpfriends079
Active Contributor
0 Kudos

Hello

Refer following link:

-

Regards

JP

former_member222080
Participant
0 Kudos

thank you sir

problem solved