B2B issue

Former Member
0 Kudos

Hi,

we have created B2B SO for two quantity and at the time odrer confrimation there was only one quantity confirmed and was delivered, and we have another 1 quantity which want to deliver , manually putting 1 in the confirmed quantiy and deliring, it says Schedule line 3 there is no requiation , but the quantity has been assigned to SO,

'

Pls guide how I can create a delivery with the remaining 1 qty.

Thanks

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi,

If quantity available in system then it confirm with existing schedule line

But if do no have qty and you try to put confirm qty then system generate another schedule line.

Once qty available run availability in sales order then it will confirm or else reschedule order by V_V2

kapil

Former Member
0 Kudos

Hi Kapil,

Thanks for your answer, here I have the quantity availble, what happned at the time schedule line confirmation user has put manually quantity 1, though order Qty is 2 and availbel is 2, now one quantity is already delivered , now there is no any schedule line for the 2 Qty , so now Iam putting mnaully 1 in the confirmed qunatity in schedule lines , with 13072011 which is the previous qty confirmed and delivered date ,

I checked availabilty,but there is no use , what I can do to deliver, Iam aftraid runung V_v2 will create any problem, any effects.

Pls advise

Thanks

Former Member
0 Kudos

Hi All

Thanks for ur answers

Thanks