how can i turn on source determination check box by default in p.req

Former Member
0 Kudos

heloo

how can i turn on source determination check box on in p.req mean whenever i use me51n in pop up sceen it should already be checked.

second how can i creat p.o form p.req automatilaly and then send it to edi.

what i do't wana use me59n iwant system once i create p.req and it has valid source just create p,o and send it to vendor.

thanks

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi

You can switch the Source determination indicator on whenever you enter..

1) Go to Personal settings in ME51N Screen>select default Values tab>if you do not find Source determination field then click More fields move the field to line 1. Now you check this field and save it.

2) To create PO from PR make sure you have valid source of supply assigned to PR and Auto PO checked in VMR & MMR, Inforecord with Valid condition exist. Run the tcode ME59N and the system will convert the PO from PR.

3) To send the PO to Vendor via EDI you need to set up EDI with the help of Abaper by using message determination procedure and EDI/ALE setting.

Hope it helps