cancel
Showing results for 
Search instead for 
Did you mean: 

About upgrading from EP5 to EP6

Former Member
0 Kudos

Dear all,

I am now developing custom iView in EP5. At the time when I upgrade the EP5 to EP6, do I need to recompile or even recode my existing custom iView (which is based on EP5)? Or I can simply upload the existing PAR file to EP6?

Thanks

Sam

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hello Sam,

because the structure of a EP Application has changed You have to "reorganize" Your Code, JSPs.....

But Eclipse and the Plugin will do the main work for You. Just import the old PAR-File. With this step a recompilation will start.

The eclipse way is the mnost user friendly way.

Walter

Former Member
0 Kudos

Hi Walter,

Is this recompilation still needed if I upgrade from EP6 SP2 to EP6 SP4?

Thanks

Sam

Former Member
0 Kudos

I have NOT tried this yet. But from my point of view defentitely NO.

Greetings

Walter

Former Member
0 Kudos

Hi Walter,

Thanks a lot

Answers (0)