can any one tell me <b>when do i get</b> this error in a process chain object.. n also what do i need to do to correct this error.. we have started it manually ..

ERROR MESSAGE is as follows on an object :-

Non-updated Idocs found in Business Information Warehouse

Diagnosis

IDocs were found in the ALE inbox for Business Information Warehouse that are not updated. Processing is overdue.

Error correction:

Attempt to process the IDocs manually. You can process the IDocs manually using the Wizard or by selecting the IDocs with incorrect status and processing them manually.

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • author's profile photo Former Member
    Former Member
    Posted on Dec 20, 2004 at 12:53 PM

    Did you search for short dumps in the ST22? Or check the system log SM21. If they are ok you might want to check for cancelled jobs that occured.

    Best regards

    Dirk

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Dec 21, 2004 at 07:49 PM

    I get this same message not daily but on a regular basis with my process chains as well. I can run them manually when I get in the next morning without any problem. There is no system dump or message on the system log on the BW or OLTP system. I was wondering if the job on the OLTP system has to wait in the background queue because none are available for instant processing and before one of the background processes frees up, the wait time for processing has expired so a message is sent back to BW? I have looked at the OLTP system at other batch jobs that were running at about the same time to see if this might be the case but I can't prove or disprove my theory.

    I'm interested in what the answer may be as well.

    Thanks,

    Diane Merrill

    ORNL UT-Battelle

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member

      HI,

      following could be done to avoid this.

      1) Increase the background processes i the bw system.

      2) Prioratize the chain with class job A by going to sm37.

      3) try the data loads when the system load is low.

      4) same withe r/3 system too. if the r/3 systems processors are busy it leads to time out errors.

      Hope it helps.

      sampath

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.