Skip to Content
0
Jun 21, 2011 at 06:40 AM

Batch Level Costing

183 Views

Hi All,

We have enable Batch Management.

I have made

PO#1 10Qty Total Price 10000 Batch 1

PO#1 20 Qty Total Price 20000 Batch 2

On Material It is showing Average Price as 1666.66

Now When i am issuing the Material to Cost Center MvtType 201 Qty 9 system is picking the same from batch 2 but the amount or unit price system is picking at Average i.e. 1666.66 where as as it should show as 18000 because it is issuing the material from secind batch and per unit cost is 2000.

Please let me know why system is picking Average Price?

Br, Vivek