Release planned price in ML after "quantities and values entered" status

Former Member
0 Kudos

Hi Experts!

I'm facing issue in releasing planned price for a material; for which the current status in period is "Quantities and Values entered".

When i try to release planned price system issues following message:

Price changes for material 6999 is not possible

Message no. C+811

Diagnosis

You want to change the price or release planned prices for material 6999 with valuation type in valuation area 1000. You have, however, already entered actual data or performed a single-level price determination in the period concerned. The status of the material in the period is Quantities and Values Entered.

Price determination indicator 3 assumes that the standard price remains constant throughout the period, so that all movements can be valuated preliminarily with the same standard price. Therefore, you can only change the standard price at the beginning of a period (i.e. as long as no actual data was entered).

System Response

The system does not allow the price changes or the release of planned prices for this material in this period.

Procedure for System Administration

In the future, to automatically release your planned prices upon creation of new actual data you can allow dynamic price release in Customizing for Actual Costing/Material Ledger.

Now Issues is that; I am unable to process billing document; as system tries to find "Active Cost Estimate"; which i cannot release due to above issue.

Best Regards

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi,

The price change or release of a cost estimate should always be the first transaction in a new period, when Material Ledger is active. Once period status = 30, the standard price cannot be released or changed and system issues c+811.

The only possible workarounds are as below:

- postpone the costing release to next month

- reverse transactions and reset the period status to 'Period opened' (10) --> please review note 574930 for details

- use the Subsequent price change (--> note 555176)

BR,

Antje

Answers (3)

Answers (3)

Former Member
0 Kudos

Thank you Antje Schmidt & Maria Luisa for support..

marialuisa_munoz
Contributor
0 Kudos

hi Aslam,

Please see the document 1492789 which explains in detail the possible options to solve the problem.

I hope this helps.

Best regards,

Maria Luisa

marialuisa_munoz
Contributor
0 Kudos

hi Aslam,

Please see the document 1492789 which explains in detail the possible options to solve the problem.

I hope this helps.

Best regards,

Maria Luisa