cancel
Showing results for 
Search instead for 
Did you mean: 

QM Process

former_member184595
Active Participant
0 Kudos

Hi,

Can any one explain me the different steps in the Quality Management till posting the goods to unrestricted stock along with the T-codes?.

Thanks in advance.

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

refer

Answers (1)

Answers (1)

former_member1362664
Contributor
0 Kudos

Hi,

Attach Inspection Type in Material master thru MM02 (03- in process and 04- Goods Receipt)

Create Inspection Method Thru QS31

Create MIC Thru QS21

Attach Inspection method in MIC

Create Sampling Procedure thru QDV1

Create Inspection plan thru QP01

Attach MIC and sampling procedure in inspection plan

Create and release of order or do GR you would find an Inspection lot in QA32

Do result recording and Give Usage Decision in QA32

Now do stock posting thru Quality Inspection to Unrestricted stock.

Regards

Vivek

former_member184595
Active Participant
0 Kudos

Thanks Sujit and Vivek for clarification