Hi Experts,
I am having 2 Transport requests for the same Z report (classical report).
I have transported both of them to quality on after another with different modifications in both of them.
Now i want to transport it to Production.
I want to know do i need to transport both the requests or do i need to transport only the last
Transport request to production ?
Please help <removed by moderator>.
Edited by: Thomas Zloch on Jun 16, 2011 10:33 AM