V10 - RA&R Rule set (Transport)

Hi,

We have heard that the new rule set in AC canu2019t be transported through the environments (DEV, QAS and PRD) in 10 as itu2019s seen as master data. Does this mean we maintain this in PRD?

Is this true?

Regards, Melvin

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • Posted on Jun 17, 2011 at 10:22 AM

    Hi Melvin,

    That is not correct. Rules can be transported in IMG -> GRC -> Access Risk Analysis -> SoD Rules -> Transport SoD Rules (or using program GRAC_TRANSPORT_ACCESS_RULES).

    Regards,

    Luis

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member Neeraj Manocha

      We are considering another approach to ruleset transport , this is by making use of logical connectors groups . The idea is to create a logical connector for each physical connector or group of physical connector. The ruleset is always uploaded against a logical connector in DEV , transported against a logical connector.

      So when it reaches the acceptance or production environment it automatically picks up the right connector assigned to the logical group .

      Thanks ,Ranjiv

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.